{"id":5702,"date":"2025-08-20T08:00:00","date_gmt":"2025-08-20T02:30:00","guid":{"rendered":"http:\/\/13.201.127.58\/?p=5702"},"modified":"2026-07-08T15:49:18","modified_gmt":"2026-07-08T10:19:18","slug":"defect-liability-period-complete-guide-for-homebuyers-and-owners","status":"publish","type":"post","link":"https:\/\/asbl.in\/blog\/defect-liability-period-complete-guide-for-homebuyers-and-owners\/","title":{"rendered":"Defect Liability Period (DLP) in Real Estate: What Indian Homebuyers Need to Know"},"content":{"rendered":"\n<p>After moving into your home six months ago, your master bedroom ceiling has developed spots where it has leaked. Your builder says it&#8217;s &#8220;normal settlement&#8221;. Your neighbour&#8217;s tiles have debonded. The staircase railing in the common lobby wobbles. All of these are defects the builder is legally responsible for. You just need to know how to claim.\u00a0<\/p>\n\n\n\n<p>The Defect Liability Period (DLP) is the window during which your builder is bound to rectify reported defects free of charge. RERA turned this from an informal commitment into a statutory obligation. This guide explains how long that window is, what types of defects it covers, and the steps to take if your builder doesn&#8217;t respond.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1What_Is_the_Defect_Liability_Period_in_Construction\"><\/span>1.<strong>What Is the Defect Liability Period in Construction?\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The Defect Liability Period is the defined timeframe after possession during which the builder remains responsible for repairing defects in the property. The concept exists in most construction contracts globally, but in India it was given statutory force through RERA in 2016.&nbsp;<\/p>\n\n\n\n<p>Before RERA, DLP provisions (where they existed) were embedded in individual sale agreements and varied widely. Some builders offered six months; others offered nothing. A buyer&#8217;s ability to enforce a claim depended entirely on what their agreement said and how willing they were to pursue it in consumer court.&nbsp;<\/p>\n\n\n\n<p>RERA changed this by setting a mandatory minimum: five years for structural defects, with a 30-day rectification timeline built in.&nbsp;<\/p>\n\n\n\n<div class=\"project_promotion_box\">\n\t<div class=\"promotion_title\"><\/div>\n\t<div class=\"project_promotion_details\">\n\t<div class=\"promotion_image\" style=\"background-image: url(https:\/\/asbl.in\/blog\/wp-content\/uploads\/2026\/07\/spectra-1.webp\">\n\t\n\t<\/div>\n\t<div class=\"promotion_content_box\">\n\t<div class=\"promo-heading\">ASBL Spectra - Ready To Move In 3BHKs only in Financial District<\/div><p>Unveil the 50-50 payment plan<\/p>\n<div class=\"box-title\"><span class=\"sft\">1980<\/span> sq. ft at just \u20b92.10 Cr <span style=\"font-size: 16px;\">(ALL INCLUSIVE + GST)<\/span><\/div>\n\n\t<div class=\"project_promotion_link\"> <a target=\"_blank\" href=\"https:\/\/asbl.in\/spectra?utm_source=Blog&utm_medium=CPC&utm_campaign=URL-6433\">View Details<\/a>\n\t<\/div>\n\t<\/div>\n\t<\/div>\n\t<div class=\"promotion_link\">\n\t<a target=\"_blank\" href=\"\">View More &nbsp;\u279d<\/a>\n\t<\/div>\n\t<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2What_RERA_Says_About_Builder_Defect_Liability_The_5-Year_Rule\"><\/span><strong>2.What RERA Says About Builder Defect Liability: The 5-Year Rule\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Section 14(3) of the Real Estate (Regulation and Development) Act, 2016 is the provision that matters. It states that if any defect in the structural integrity or workmanship, quality of materials, or provision of services is brought to the builder&#8217;s notice within five years of the date of possession, the builder must rectify it free of charge within 30 days of receiving the complaint.&nbsp;<\/p>\n\n\n\n<p>Three things in this provision matter:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Five years from possession, not from completion or OC date. The clock starts on the day you take the keys.\u00a0<\/li>\n\n\n\n<li>30 days to rectify after the builder receives your written notice. Not 30 days to respond. 30 days to fix.\u00a0<\/li>\n\n\n\n<li>Free of charge. The builder can&#8217;t pass the repair cost to the buyer or charge a maintenance fee for DLP-covered defects.\u00a0<\/li>\n<\/ul>\n\n\n\n<p>If the builder fails to rectify within 30 days, you&#8217;re entitled to compensation, not just repeated follow-up. The law doesn&#8217;t expect buyers to keep chasing indefinitely.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"559\" src=\"https:\/\/asbl.in\/blog\/wp-content\/uploads\/2025\/08\/Gemini_Generated_Image_tv0q04tv0q04tv0q-1024x559.png\" alt=\"\" class=\"wp-image-10138\" srcset=\"https:\/\/asbl.in\/blog\/wp-content\/uploads\/2025\/08\/Gemini_Generated_Image_tv0q04tv0q04tv0q-1024x559.png 1024w, https:\/\/asbl.in\/blog\/wp-content\/uploads\/2025\/08\/Gemini_Generated_Image_tv0q04tv0q04tv0q-300x164.png 300w, https:\/\/asbl.in\/blog\/wp-content\/uploads\/2025\/08\/Gemini_Generated_Image_tv0q04tv0q04tv0q-768x419.png 768w, https:\/\/asbl.in\/blog\/wp-content\/uploads\/2025\/08\/Gemini_Generated_Image_tv0q04tv0q04tv0q.png 1408w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>For context on how RERA obligations fit into the broader builder-buyer relationship, our <a href=\"https:\/\/asbl.in\/blog\/ts-rera-guide-for-beginners-how-to-verify-projects-stay-safe\/\">beginner&#8217;s guide to verifying RERA projects in Telangana<\/a> covers the TSRERA portal and how to check a builder&#8217;s compliance history.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3What_RERA_Says_About_Builder_Defect_Liability_The_5-Year_Rule\"><\/span>3.<strong>What RERA Says About Builder Defect Liability: The 5-Year Rule\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>RERA&#8217;s DLP provision covers three categories. Understanding the distinction helps you argue your case clearly when a builder tries to dismiss a complaint as &#8220;outside warranty.&#8221;&nbsp;<\/p>\n\n\n\n<p>Structural defects, always covered:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cracks in the columns, beams, slabs, and walls that support the structure\u00a0<\/li>\n\n\n\n<li>Foundation settlement causing floors or walls to tilt\u00a0<\/li>\n\n\n\n<li>Roof failure or major water ingress through the roof structure\u00a0<\/li>\n\n\n\n<li>Parapet or slab failure\u00a0<\/li>\n<\/ul>\n\n\n\n<p>Workmanship and materials defects, also covered under RERA&#8217;s DLP:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Water seepage through external walls or roof surfaces\u00a0<\/li>\n\n\n\n<li>Damage to tiles in other areas of the home, such as becoming unglued and hollow in the floor or bathroom\u00a0<\/li>\n\n\n\n<li>Plumbing problems such as blocked drains and leaking joints and\/ or working without water hammer in your home.<\/li>\n\n\n\n<li>Electrical problems such as loose wiring or no grounding.\u00a0<\/li>\n\n\n\n<li>Waterproofing failure in wet areas\u00a0<\/li>\n<\/ul>\n\n\n\n<p>What is NOT covered:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A normal amount of wear and tear on such things as carpet, paint, and the hardware of the house, if the owner has been responsible for the damage.<\/li>\n\n\n\n<li>Damage caused by the owner (drilling through waterproofing membranes, overloading slabs, modifying plumbing)\u00a0<\/li>\n\n\n\n<li>Fittings or fixtures the owner installed themselves after possession\u00a0<\/li>\n\n\n\n<li>Cosmetic issues that don&#8217;t affect habitability or structure\u00a0<\/li>\n<\/ul>\n\n\n\n<p>When a builder tells you that your seeping wall is &#8220;general maintenance,&#8221; ask them to confirm that in writing. Seepage through an external wall within five years of possession isn&#8217;t maintenance. It&#8217;s a defect in waterproofing quality or workmanship, and it falls under RERA&#8217;s DLP.\u00a0(<a href=\"https:\/\/www.turtons.com\/blog\/what-is-the-defects-liability-period\" title=\"Source\">Source<\/a>)<\/p>\n\n\n\n<p>Buyers who want to assess structural quality more broadly will find our <a href=\"https:\/\/asbl.in\/blog\/what-structural-audits-reveal-about-concrete-building-lifespan\/\">guide to structural audits and concrete building lifespan<\/a> useful for understanding what to look for.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4How_to_Raise_a_Defect_Complaint_With_Your_Builder_Step_by_Step\"><\/span><strong>4.How to Raise a Defect Complaint With Your Builder: Step by Step\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>The most common mistake buyers make is complaining verbally and repeatedly without creating a documented record. Verbal complaints can&#8217;t be used in a RERA proceeding. Here&#8217;s the process:&nbsp;<\/p>\n\n\n\n<h5 class=\"wp-block-heading has-ast-global-color-3-color has-text-color has-link-color wp-elements-d7e79824d6cca65220a97e074d33ac91\"><strong>Step 1: Create evidence of the defect\u00a0<\/strong><\/h5>\n\n\n\n<p>Take a photo or video of the defect now and document when you did so and where it is located (unit number, room, wall face, floor tile). If you are documenting a leaking ceiling you should try to come when the leak can be observed (i.e. after rain) so it is easier to observe.<\/p>\n\n\n\n<h5 class=\"wp-block-heading has-ast-global-color-3-color has-text-color has-link-color wp-elements-56dd7d6ecf341d1b87794dbbebc4a5ca\"><strong>Step 2: Prepare formal defect notice\u00a0<\/strong><\/h5>\n\n\n\n<p>Prepare in writing a defect notice that includes all the information about the defect, including when you first observed the defect, where it is located, etc. Write in a factual manner and be precise in what you write. Send it:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>By email to the builder&#8217;s official customer care or handover team address (creates a timestamped digital record)\u00a0<\/li>\n\n\n\n<li>By registered post to the builder&#8217;s registered office address (creates a physical delivery record)\u00a0<\/li>\n<\/ul>\n\n\n\n<p>Both channels together give you the strongest documentation trail.&nbsp;<\/p>\n\n\n\n<h5 class=\"wp-block-heading has-ast-global-color-3-color has-text-color has-link-color wp-elements-e57472cd5299bb9236713f9d19c58b71\"><strong>Step 3<\/strong>: <\/h5>\n\n\n\n<p>at the 30-day point, check back with the builder; if the builder has yet to acknowledge or even begin the repair work for your property by that point, send further correspondence reminding [him or her] that the builder&#8217;s 30-day statutory rectification window has now passed under Section 14(3) of the RERA Act.<\/p>\n\n\n\n<h5 class=\"wp-block-heading has-ast-global-color-3-color has-text-color has-link-color wp-elements-5deac03799fc5b346c7114be97bb25ce\"><strong>Step 4<\/strong> :<\/h5>\n\n\n\n<p>It is to escalate your claim if, after your correspondence, there has not yet been any response from the builder.<\/p>\n\n\n\n<p>If repair isn&#8217;t initiated or completed within a reasonable period after the 30-day mark, proceed to TSRERA.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5What_to_Do_If_Your_Builder_Ignores_Your_Defect_Notice\"><\/span>5.<strong>What to Do If Your Builder Ignores Your Defect Notice\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>A builder ignoring a defect notice within the DLP window is a RERA violation, not just a customer service failure. Your options:&nbsp;<\/p>\n\n\n\n<p><strong>File a complaint with TSRERA.<\/strong> Visit rera.telangana.gov.in and file through the complaints section. Attach:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Your possession letter (showing the possession date and starting the 5-year clock)\u00a0<\/li>\n\n\n\n<li>Photographs of the defect\u00a0<\/li>\n\n\n\n<li>Your written notice to the builder (email or postal proof of delivery)\u00a0<\/li>\n\n\n\n<li>Builder&#8217;s response or evidence of non-response\u00a0<\/li>\n<\/ul>\n\n\n\n<p>TSRERA can direct the builder to rectify the defect, pay compensation for the cost of repair, or in cases of significant structural failure, issue a refund of the consideration amount with interest.&nbsp;<\/p>\n\n\n\n<p><strong>File in consumer court.<\/strong> Separately from RERA, buyers can approach the district consumer forum for compensation. Both avenues can be pursued, though RERA is generally faster for construction defects.&nbsp;<\/p>\n\n\n\n<p>The key is documentation.Having a documented paper trail (using letters of notice, delivery, timestamped pictures) places buyers in a significantly stronger position than using only a phone call or WhatsApp to communicate your claim.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"6Defects_in_Common_Areas_Builder_Responsibility_vs_Housing_Society\"><\/span>6.<strong>Defects in Common Areas: Builder Responsibility vs Housing Society\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Common areas matter as well; there can be much confusion surrounding who is responsible for fixing damaged areas like the reception area, stairwells, terraces, and club amenities.&nbsp;<\/p>\n\n\n\n<p>They&nbsp; are covered under the same five-year RERA DLP. The builder&#8217;s liability applies to the building as a whole, not just individual flats. This means seepage in a common corridor ceiling, a malfunctioning lift, or a terrace waterproofing failure are all within the DLP window.&nbsp;<\/p>\n\n\n\n<p>In practice, the Residents&#8217; Welfare Association (RWA) or its interim equivalent takes on the role of monitoring and raising common area defect complaints. Homeowners can also make their own individual claims against the builder regarding their failure to fix or repair the common areas; however, the association acting together will be more effective than the individual ones acting apart.<\/p>\n\n\n\n<p>Once the five-year DLP has ended, the RWA then becomes solely responsible for the ongoing maintenance and repair for the common areas. Therefore, it is imperative that the association keeps a careful record of all outstanding defects and formally notifies the builder prior to the expiration of the DLP period.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"7Does_DLP_Apply_to_Resale_Apartments\"><\/span>7.<strong>Does DLP Apply to Resale Apartments?\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Yes, but with a critical condition: the DLP is tied to the original possession date, not to the date of resale purchase.&nbsp;<\/p>\n\n\n\n<p>If you buy a resale apartment where the original buyer took possession two years ago, you have three years of the builder&#8217;s RERA DLP remaining. The builder&#8217;s obligation doesn&#8217;t reset on resale.&nbsp;<\/p>\n\n\n\n<p>Once the five years from the original possession date have elapsed, no RERA DLP applies, regardless of when you bought the apartment. Any defect remediation after that point becomes the owner&#8217;s or the society&#8217;s responsibility.&nbsp;<\/p>\n\n\n\n<p>Before buying any resale property, confirm:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The original possession date (shown on the possession letter)\u00a0<\/li>\n\n\n\n<li>How many years of DLP remain\u00a0<\/li>\n\n\n\n<li>Whether any defects have already been reported to or acknowledged by the builder\u00a0<\/li>\n<\/ul>\n\n\n\n<p>Our <a href=\"https:\/\/asbl.in\/blog\/what-is-oc-and-cc-in-real-estateyour-essential-guide\/\">guide to OC and CC in real estate<\/a> explains the possession-related documents to check when evaluating any resale apartment.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"8FAQs\"><\/span>8.<strong>FAQs<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\"><h3 class=\"aioseo-faq-block-question\"><span class=\"ez-toc-section\" id=\"1What_is_the_defect_liability_period_under_RERA\"><\/span><strong>1.What is the defect liability period under RERA?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><div class=\"aioseo-faq-block-answer\">\n<p>According to the Real Estate (Regulation and Development) Act 2016, section 14(3), builders are responsible for structural defects and defects related to workmanship, quality, and the provision of services for a period of five years from the date of possession. If any defects are reported within the 5-year period, builders are required to correct these defects free of charge within 30 days after receiving notice thereof.<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\"><h3 class=\"aioseo-faq-block-question\"><span class=\"ez-toc-section\" id=\"2What_types_of_defects_are_included_in_the_RERA_five-year_DLP\"><\/span><strong>2.What types of defects are included in the RERA five-year DLP?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><div class=\"aioseo-faq-block-answer\">\n<p>RERA includes coverage for defects of construction (e.g. cracks in columns, beams and slabs \u2014 settlement of structures; failures of roofs and ceilings) and also for workmanship defects (e.g. ceilings\/walls leaks, tile failures, failures in plumbing, etc.) as well as a provision for deficient service (e.g. faulty electrical wiring, errors in plumbing installations, etc.). However, there is no coverage for ordinary wear and tear, for damages caused by the owner of the home, or for defects in\/ due to the owner&#8217;s installations\/fixed items (e.g., cabinets, countertops, etc.).\u00a0<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\"><h3 class=\"aioseo-faq-block-question\"><span class=\"ez-toc-section\" id=\"3What_is_the_process_for_submitting_a_defect_complaint_to_the_builder\"><\/span><strong>3.What is the process for submitting a defect complaint to the builder?\u00a0<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h3><div class=\"aioseo-faq-block-answer\">\n<p>Take photos and write down a description of the defect. Email and send a registered letter to the builder notifying them by providing specifics on what the defect is. Request that the builder rectify or fix the defect(s) within 30 days.In the event that the builder fails to respond within 30 days, a complaint should be filed at the TSRERA portal, rera.telangana.gov.in, with copies of all documentation that has been sent to the builder.<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\"><h3 class=\"aioseo-faq-block-question\"><span class=\"ez-toc-section\" id=\"4What_if_my_builder_ignores_my_defect_notice\"><\/span><strong>4.What if my builder ignores my defect notice?<\/strong>\u00a0<span class=\"ez-toc-section-end\"><\/span><\/h3><div class=\"aioseo-faq-block-answer\">\n<p>If the builder still has not corrected the defect within 30 days, a complaint may be filed with TSRERA who may instruct the builder to rectify the defect and\/or pay compensation. with TSRERA. RERA authorities can direct the builder to rectify the defect or pay compensation. In cases of significant structural defects, RERA can also order a refund of the consideration amount with interest if the property is rendered uninhabitable.\u00a0<\/p>\n<\/div><\/div>\n\n\n\n<div data-schema-only=\"false\" class=\"wp-block-aioseo-faq\"><h3 class=\"aioseo-faq-block-question\"><span class=\"ez-toc-section\" id=\"5Does_the_defect_liability_period_transfer_when_I_buy_a_resale_apartment\"><\/span><strong>5.Does the defect liability period transfer when I buy a resale apartment?<\/strong>\u00a0<span class=\"ez-toc-section-end\"><\/span><\/h3><div class=\"aioseo-faq-block-answer\">\n<p>The DLP is linked to the original possession date, not to subsequent ownership. If you buy a resale apartment where possession was granted three years ago, you have two years of DLP remaining. After the five-year defect liability period ends, you or your society will be responsible for rectifying any defect(s).<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>After moving into your home six months ago, your master bedroom ceiling has developed spots where it has leaked. Your [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5701,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}},"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[6],"tags":[],"class_list":["post-5702","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hyderabad-real-estate"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/posts\/5702","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/comments?post=5702"}],"version-history":[{"count":6,"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/posts\/5702\/revisions"}],"predecessor-version":[{"id":10139,"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/posts\/5702\/revisions\/10139"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/media\/5701"}],"wp:attachment":[{"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/media?parent=5702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/categories?post=5702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/asbl.in\/blog\/wp-json\/wp\/v2\/tags?post=5702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}