Parking
Markings
Designated markings for each flat and visitor parkingSignages at relevant points

Lifts
High-speed lifts of reputed make
Passenger Lifts : 26Service Lifts : 4

DG Backup
100% backup

Structure
RCC Shear Wall structure to withstand wind and seismic loads (Zone-2)

Flooring
Corridor
Vitrified tilesStaircase
Natural stone/Vitrified tiles
External Finishes
Texture finish and two coats of exterior emulsion paint of reputed brand

Security
CCTV cameras at designed locations
Dedicated security cabin for surveillance

Fire Safety
Fire equipment as per National Building ode (NBC) regulations
Fire AlarmsFire Hydrants
Fire Sprinkler System

Common Area Lighting
Power for common area lighting will be provided from both Solar and transformer

WTP and STP
Water treatment plant (WTP) for softening and treating of water
Sewage treatment plant (STP) of adequate capacity as per regulatory norms
Treated sewage will be used for flushing and landscaping purposes
Water Harvesting: Rainwater harvesting pits provided for recharging ground water level

EV Charging Point
One charging point will be provided for each flat in their parking space
