Download detailed list from here!
Power back up

100% dg set backup with acoustic enclosure & amf.
LPG

Supply of piped natural gas from sub-station / supply of gas from centralized gas bank to all individual flats with prepaid gas meters.
Lifts

High-speed lifts of reputed make. Lift lobby
cladding with vitrified tiles /granite.
Security

Comprehensive security system with cameras in Appropriate locations.
Structure

RCC -framed structure, resistant to wind and earthquake (Zone -2)

Fire safety


Fire equipment as per Fire regulations
Billing system

Automated prepaid billing system for water, power, gas.
Corridor flooring

Vitrified tiles with spacer joint
Staircase

Natural stone/clay tiles/staircase tiles
WTP and STP

  • Water treatment plant for bore-well water and water meter for each unit.
  • A sewage treatment plant of adequate capacity as per norms will be provided inside the project.
  • Treated sewage water will be used for landscaping and flushing purposes.
External Finishing

Texture finish & two coats of exterior emulsion paint of reputed brands with the architectural features
Scroll to Top
Enquire Now
Explore
WhatsApp

Start a Whatsapp chat with us!